We install a concrete pad and footings with engineered steel base plates installed to specific client required dimensions, we bring in all utilities (electric, water, gas and sewer) to the new ADU location, and for this project we also installed a stacked retaining wall to hold back a small slope above the new ADU.
Projects / ADU install – Pinole, CA
Subscribe now to keep reading and get access to the full archive.